Taking into account the changes in the Plan of Track Works and works on the maintenance of navigable hydraulic structures dated 16 March 2021, formed by the State Water Transport Administration, approved by the Ministry of Transport and Communications of the Republic of Belarus, from 20 March 2021 navigation equipment began to operate on the following sections of the inland waterway:
- Pina River (confluence of the Dnieper-Bug canal and the Pina river –Pinsk (the confluence of the Pina River and the Pripyat River) – sign «prohibition of passage»):
port of Pinsk – Pinsk (confluence of the Pina and Pripyat rivers), with a length of 8.9 km. - Pripyat River (Pinsk (confluence of the Pina River and the Pripyat River) – Usovsky perekat-1 (border with Ukraine)):
Pinsk (confluence of the Pina River and Pripyat) – Kachanovichi railway station, 23.3 km long. - Upper section of the Pripyat River (7 km of the Pripyat River – Pinsk, the confluence of the Pripyat River and the Pina River):
7 km of the Pripyat River – Pinsk (the confluence of the Pina and Pripyat rivers), with a length of 7 km.